Alerts & Learnings Health and Safety Executive - Safety Notice: Offshore crane boom hoist rope failures Target audience: All personnel involved in the operation, maintenance, and inspection of offshore cranes. Two incidents have occurred offshore, involving the failure of crane boom hoist ropes, resulting in the crane booms falling on the deck below. Duty holders are advised to ensure that:when high winds are forecast, the positioning, and if necessary, the securing of crane booms, is in accordance with the relevant crane manufacturer's guidanceif manufacture's guidance outlines that the boom should be stowed in the boom rest, slack rope should not be allowed to form between the sheaves in the 'A' frame and those at the boom tip or bridle assembliescranes are operated in a controlled and smooth manner to reduce, so far as is possible, any bouncing of the crane boomwhen a crane is designed to have sheave rope retention bars fitted, these are in a good conditioncrane pre-use checks include the requirement to verify that all the ropes are correctly seated and running in the rope sheaveswhen new boom hoist ropes are fitted that the method of installation reduces the possibility of a twist being introduced View the Health and Safety Executive Safety Notice for full details. Rate this Alert Your Rating Average Rating Share: Share on Linkedin Share on Facebook Share on Twitter Share with Email