Alerts & Learnings Lessons Learned - Reeving Wire Rope Incidents may occur when reeving wire rope. There have been incidents in the past involving cable grip or “snake” equipment release during drill line reeving activities on North Sea Installations. The operation is generally carried out infrequently, e.g. at initial construction and major inspections, or after failures when the Travelling Block is removed from the derrick This summary aims to share key lessons from previous incidents. Download Alert Rate this Alert Your Rating Average Rating Share: Share on Linkedin Share on Facebook Share on Twitter Share with Email