Alerts & Learnings Maintaining Process Equipment - Loss of Containment A maintenance worker was instructed to reduce bolt a flange join on a heat exchanger shell. This was in the work scope and documented in the work permit. The worker set up their work area and then commenced work on the wrong heat exchanger shell, which was live. An operator noticed that work was proceeding on the wrong exchanger shell and instructed the worker to stop. To view this Safer Togethersafety alert in full, click the 'Download Alert' button above and refer to the document. Download Alert Rate this Alert Your Rating Average Rating Share: Share on Linkedin Share on Facebook Share on Twitter Share with Email