Alerts & Learnings

Maintaining Process Equipment - Loss of Containment

A maintenance worker was instructed to reduce bolt a flange join on a heat exchanger shell. This was in the work scope and documented in the work permit.

The worker set up their work area and then commenced work on the wrong heat exchanger shell, which was live.

An operator noticed that work was proceeding on the wrong exchanger shell and instructed the worker to stop.

To view this Safer Togethersafety alert in full, click the 'Download Alert' button above and refer to the document.

Download Alert

Rate this Alert

Your Rating

Average Rating

Join over 185 organisations making a difference

Membership connects your organisation to shared expertise, practical resources and collaborative leadership in safety and wellbeing.

I Stock 2218565815