NTSB: diesel generator engine failure

An offshore supply vessel was conducting sea trials after a long period of maintenance, when its no. 3 main diesel generator engine suffered a mechanical failure that resulted in a fire in the engine room. The crew extinguished the fire before it could spread throughout the vessel. There were no injuries nor pollution reported, but damage to the vessel amounted to around $1.1 million.

During the maintenance period, service technicians identified a standard-sized connecting rod bearing on the no. 3 main engine that did not meet the service company’s specifications and, in accordance with their policy, replaced all the connecting rod bearings with standard-sized bearings. They also removed and inspected the no. 6 main bearing, which, unbeknownst to them, was undersized with a smaller inner diameter.

Because none of the connecting rod bearings they replaced had been machined, the technicians used standard-sized bearings to replace the no. 6 main bearing, since it was the service company’s expectation that both main bearing journals and connecting rod bearing journals would be machined at the same time. There was no record of the main bearing’s part number in the service technician’s notes; therefore, the technician likely did not identify and record the part number. The service company’s standard practice was to replace any removed bearings with new bearings, so a new standard-sized bearing was ordered and installed.

After maintenance was completed, sea trials were scheduled to test and ensure the proper operation of the vessel’s engines, propulsion systems, and automatic power management system. During the tests, with the two stern thrusters about 75% load, and the no. 3 main engine about 30% load, the engineering crew in the ECR heard a “large bang” and observed smoke in the engine room. No. 3 main engine experienced a catastrophic mechanical failure. The no. 6 main bearing’s incorrect size allowed lube oil to leak from the larger clearances of the bearing in the no. 3 main engine, thus decreasing the lube oil supply pressure to the adjacent nos. 9 and 10 connecting rod journal bearings. The loss of lube oil supply pressure resulted in a rapid temperature increase of the connecting bearings and subsequent fracturing of the bearing cap bolts on the nos. 9 and 10 connecting rods. As a result, several engine components broke free while the engine was running. These components were strewn about the crankcase, blew open the inspection cover and part of the engine block, and allowed hot oil and gas to start a fire in the engine room.

The crew’s response to the fire was timely and effective. They quickly stopped the running engines, isolated all fuel supplies, shut down engine room ventilation systems, and closed the space’s air dampers and watertight doors to effectively starve the fire of fuel and oxygen, thereby preventing its spread. After the captain called for help, tugboats quickly returned to the vessel to assist it as the crew fought the fire. Additionally, the crew activated the vessel’s fixed CO2 fire extinguishing system, which effectively diminished and smothered the fire.

To view this IMCA: National Transportation Safety Board of the United States safety alert in full, click the 'Download Alert' button above

Download Alert

Rate this Alert

Your Rating

Average Rating

More from this Workgroup

Alert
Scis main logo colour

Potential Dropped Objects (PDOs) returned with units

In the offshore environment Potential Dropped Objects (PDO’s) are a major safety risk as the transportation of units is normally completed using cranes and lifting items great heights. This poses the risk of items falling and striking personnel in the vicinity. Over the years, many PDO’s have been d…

Alert
Scis main logo colour

Dropped Object Due to Corroded Deluge Flange

After landing a lower completion assembly on the drill floor and while retracting the deck crane whip line and twin hook stinger back through the v-door, the twin hook stinger swung to starboard causing one of the hooks to strike a blanking flange on the drill floor deluge line. The 4.95kg blanking …

Alert
Scis main logo colour

Rust Particle Enters Eye During Spool Removal

A Mechanical Tech was tasked with the removal of a spool. Due to the location of the spool, the technician had to work in a restricted space, lying on their back to access the flange bolts. During removal, the IP felt what they believed to be rust, hit their face. Following this, the IP re-positione…