Alerts & Learnings

Pulsation dampener failure

During well displacement, a sudden loss in standpipe pressure was observed. (Max circulation pressure at time of the incident was 1750psi). The Driller immediately shut down all mud pumps. The Derrickman confirmed that the discharge dampener on Mud Pump # 3, had separated from the flange area and was wedged in the overhead ducting/pipework above the pump. Note: No personnel were in the pump-room area at the time.

To view the original IADC Safety Alert, click on the 'Download Alert' button above.

Download Alert

Rate this Alert

Your Rating

Average Rating

Join over 185 organisations making a difference

Membership connects your organisation to shared expertise, practical resources and collaborative leadership in safety and wellbeing.

I Stock 2218565815