Alerts & Learnings Small bore tubing connection failure When bringing a new well online a section of instrument tubing parted from an instrument block and bleed valve on a pressure transmitter allowing an uncontrolled release of >200kg of hydrocarbon gas at 200barg. The release did not ignite. The platform’s fixed fire and gas detection system initiated the general platform alarm, shutdown, blowdown and deluge in the well-bay area. Download Alert Rate this Alert Your Rating Average Rating Share: Share on Linkedin Share on Facebook Share on Twitter Share with Email