Unplanned Hydrocarbon Release Following Internal Erosion of Choke Valve

No personnel were working, or transiting through the area at time of release, which was subsequently calculated at 28.5kg. A full muster was completed without incident or injury.

It was determined that the leak had occurred through erosion of the choke valve body causing a 40mm by 3mm perforation. The choke model has a 'no-go' Critical Operating Area (COA) of 0-25% open where, if remaining in this position for lengthy periods of time, can result in erosion. Normal operation of the well had the choke at 100% open and only within the COA for short periods of time (5-10 minutes) upon well restart from PBUs, planned shutdown etc. The choke valve had been in place for over 14 years. PBUs on the well became a more frequent requirement over the past 5 years. No sand production monitoring had been conducted on the wells- historically solids volumes in separators always found to be minimal.

A 6 monthly inspection regime had been in place for several years; however, this planned maintenance was cancelled on the incorrect understanding that all alluding plate chokes had been replaced.

All wells with alluding plate type choke valves remained shut in post incident and are to remain offline until they are changed to an alternative.

Download Alert

Rate this Alert

Your Rating

Average Rating

Join over 185 organisations making a difference

Membership connects your organisation to shared expertise, practical resources and collaborative leadership in safety and wellbeing.

I Stock 2218565815